The Building Process

At Eco Mods we pride ourselves on the finer details. We are with you every step of the way.

Location, Financing & Plans

  • Secure pre-approval
  • Find Land if not already owned
  • Perform perc test if no public sewer (conduct prior to land purchase if not already owned)
  • Select modular model, options
  • Develop and finalize prints, plans, options, finishes and specs
  • Contracts signed
  • Sign-off on plans and specs
  • Pay deposit
  • Close loan


Start the Building

Location, Financing & Plans

  • Secure pre-approval
  • Find Land if not already owned
  • Perform perc test if no public sewer (conduct prior to land purchase if not already owned)
  • Select modular model, options
  • Develop and finalize prints, plans, options, finishes and specs
  • Contracts signed
  • Sign-off on plans and specs
  • Pay deposit
  • Close loan


Start the Building Process

  • Establish construction activities/schedule
  • Apply for and post permits (building, electrical, plumbing, mechanical, road/culvert)
  • Application for gas/electrical service
  • Site survey (stake out home and improvements)


Foundation and Site Work:

  • Deliver dumpster and port-a-potty
  • Site preparation, remove obstacles
  • Layout and excavation
  • Form footings
  • Pour footings
  • Footing inspection
  • Install under-slab utilities
  • Block delivery/foundation systems
  • Construct/install foundation walls
  • Inspect foundation drains
  • Apply foundation damp-proofing and vapor barrier
  • Install anchor clips/bolts, sill plate and sealer
  • Install foundation drain tile and cover
  • Prep opening in floor for posts/support columns
  • Backfill


Site Preparation

  • Foundations and footings are completed
  • Foundation is square and level
  • Foundation and footings have passed inspection
  • Obstacles for crane and transporters have been removed
  • Access route for crane and transporters is planned
  • Crane pad is ready and firm
  • Set crew and crane schedules are confirmed
  • Bulldozer and operator scheduled and confirmed
  • Utility crews have been scheduled for turn-off/turn-on (if applicable)
  • Payment for delivery day confirmed and available


Modular Home Set

  • Home is delivered/received
  • Unwrap house
  • Check inventory of ship-loose materials
  • Mark mating lines on the foundation
  • Locate pick-points on the house, prepare for lifting
  • Home set
  • Fasten and check home
  • Prepare mating surfaces
  • Prepare wires, pipes, ducts and stairs
  • Posts/support columns set/installed
  • Lift jointed roof sections with crane
  • Lift dormers and other roof elements
  • Make the home weather-tight and secure
  • Sign set-release


Exterior Finishing

  • Siding completed
  • Masonry work completed*
  • Prime, paint or stain exterior surfaces*
  • Install shutters*
  • Install chimney stack*
  • Install gutters and downspouts*
  • Optional garages completed*
  • Optional porches, decks and patios completed*


Interior Electrical and Plumbing

  • Install circuit breaker box
  • Install meter box, conduit master, & service entrance cable 
  • Connect wiring of home and tie-in to junction box
  • Connect service in garage and outbuildings if applicable
  • Install sump pump*
  • Install 220v service for range/dryer
  • Electrical inspection
  • Plumbing Connections
  • Drill/install well & pump or hook-up to public system
  • Install/inspect septic and drainage systems or  hook-up to public systems
  • Install shower doors
  • Install supply and drain lines/connect to stubbing
  • Install gas pipes to range/dryer/water heater if applicable
  • Check and tighten shut-off valves
  • Plumbing inspection
  • Install electric water heater and connect to breaker box
  • Install electric water heater and connect to breaker box


HVAC 

  • Install/connect ac system
  • Install oil tank and line to furnace if applicable
  • Connect chimney flue into furnace
  • For baseboard electrical heat, connect circuits at junction box
  • Vent dryer
  • Install security system
  • Connect central vac system
  • Mechanical inspection


Interior Finishing

  • Finish/patch drywall
  • Paint interior walls*
  • Finish interior trim and doors/adjust
  • Install or seam vinyl, hardwood, laminate or carpeting at mate walls
  • Clean-up


Exterior Final Finish

  • Complete garage floors, steps, service walks, etc.*
  • Install exterior lights and bulbs*
  • Finish grading
  • Landscaping*
  • Garage doors*
  • Exterior clean-up


Closing

  • Punch list
  • Final clean-up – remove dumpsters & port-a-potty
  • Walk through with customer
  • Final building inspection
  • Occupancy permit
  • Owner occupancy


Congratulations on starting your  journey to building your new home.


*these items may be optional and are for an additional price or may not be available

Copyright © 2022 Eco Mods - All Rights Reserved.

Powered by GoDaddy

  • Floor Plans
  • Building Process
  • Contact Us
  • Q&A

This website uses cookies

We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

DeclineAccept

Welcome To Eco Mods

Thank you for visiting our site. Please  contact us for more info on how we can help build your dream home from start to finish. 

Contact Us Now